Construction Near Willow Grove Branch

Allow a few extra minutes for your trip to the Willow Grove Branch of Settlement Music School during the construction on Davisville Road. The construction started earlier this week on September 25 and will continue through December as the water company upgrades their pipes.

Local traffic, for residents and businesses such as the Willow Grove Branch, is being allowed past the detour signs.One or both gates to the Willow Grove Branch parking lot will be open to Settlement students during school hours.

Some suggested alternate routes, courtesy of Branch Director Patricia Manley:


Church Street is parallel to Davisville Road. Turn onto Church Street from York Road (Route 611) at the light and take a left turn, past the detour signs, onto Everett, Forest, or Abbeyview Roads which will bring you down the hill in front of the school’s parking lot.

Tuesday, March 23, 2010

Just like an Erector Set

Things are really heating up now at the Willow Grove Construction Site. The picture to the right was taken two weeks ago, just as the steel was first delivered to the work site.

Not more than a day later, the frame of the building is taking a very definite shape. If we think of the building as a body, we've got a skeleton (steel frame), a couple layers of skin (exterior concrete walls), and a few pieces of circulatory system (exterior drains).

Interior walls (which, if we're stretching our body metaphor, are what, cell walls or muscle fibers?) are still a few months away, but we're well on our way to something that actually resembles a building.

The pictures in this post all were taken within the space of a week, which our construction guru tells us is about perfect for a structure like ours.

More updates as we get new pictures. In the meantime, take a few seconds to become a fan of Settlement on Facebook. Then check out the fan page and let us know what you think.

Friday, March 12, 2010

Snow and more Walls

So there was the matter of a little snow in the middle of February. Okay, a lot of snow. But we've got a lot full of construction equipment -- the kind of equipment that moves giant piles of dirt without a problem.

So a little bit of snow didn't slow construction much at all. The bulldozer just shoved the most inconvenient mounds out of the way.

Then workers got started on a retaining wall that will run the length of the rear of the property along the railroad track. Importantly, the parking lot for the new branch will be between the building and the railroad tracks, so the retaining wall serves the important purpose of building up the ground back there so it brings the parking lot to a reasonable level. The shot to the left is just the first level or two of that wall.

A few days later, not only is the wall a good bit larger, but we're already packing dirt behind it tightly enough that the construction equipment is rolling across it without a problem. You'll notice that the snow on that dirt mound didn't last long, either.

While the snow itself didn't slow down work that much, the after effects did cause a few issues.
Remember that picture of the elevator pylon from a few posts ago? Well, they had recently dug out the area around the pylon to fit the sleeve that will become the base of the elevator.

Melting snow flooded that newly dug hole, and as it turns out, it's a lot easier to move snow than water.

Rest assured, though, work continues. Stay tuned next week when we'll post photos of a whole lot of steel.

The first of a few Willow Grove Updates

In the last few weeks we've had two separate snowstorms (albeit close together), and we're about to get hit with a torrential downpour this weekend. But while weather and 102nd Anniversary Gala preparations have prevented blog updates, these circumstances haven't slowed down work on the Willow Grove Branch construction site.

In the first of a few posts today, we'll be bringing you up to speed on how the site has progressed since early February. In our last post, we shared pictures of the pre-fabricated forms that were erected in preparation for poured concrete. Take down those forms, and voilĂ , walls!

Point of interest: The ridge that runs around these concrete walls is actually where the bottom-most layer of the brick facade will be laid.

You can also make out the shadow of our intrepid photographer, Settlement's Facilities Manager Bob Giannone.

And taken from my favorite angle, compare the following shot with one taken back in December.

Come back later today for a few shots in the recent snow, as well some work done earlier this week.

Monday, January 25, 2010

The Shape of Things to Come (Walls)

Things are literally beginning to take shape at the Willow Grove branch site. Throughout this post, you'll see pictures of bare rebar sticking out of the ground, marking the places where walls eventually will stand.

The corner you see in the photo on the right marks the left corner of the building as viewed from Davisville Road.

While it may be raining cats and dogs today, the weather last week was perfect for the next stage of the process. Lightweight, pre-fabricated forms were delivered, then erected around the rebar frame.

Once the form is in place, concrete will be poured inside it, surrounding the rebar, which serves to reinforce the walls.

The white forms represent what will be the back of the new facility, which faces the road. You'll enter the parking lot from the left side of the rear of the building, then park on the side that isn't visible from the road.

Thusly, the front entrance of the building actually is in the rear of the lot, on the same side as the railroad tracks that occasionally make their way into the pictures.

Here's another shot of the concrete form from the other end of the lot. Part of the wall created here will be under the ground, forming one wall of the building's lowest floor.

Have a question about the Willow Grove construction project? Let us know in the comments below and we'll do our best to answer it.

Friday, January 22, 2010

Elevators, jacks and pylons, on my!

Exciting stuff happened at the site of the Willow Grove branch just after the first of the year. The big trailer you see to your right was pulled onto the lot in order to lay the groundwork for a piece of the construction process that won't happen for a few months.

Any guesses? In case the subject of today's post didn't give it away, this jack drilled a solid metal pylon straight into the ground. Thirty-eight feet straight into the ground to be precise.

When it's installed a few months from now, the weight of the elevator machinery will rest on top of this pylon.

Just a reminder, you can see larger versions of each of these images by clicking on them.

Monday, January 4, 2010

Willow Grove Construction Over the Holidays

As you can see from the photos on this post, real work on the Willow Grove project started in earnest in December.

Once the construction vehicles arrived, the first goal on site involved clearing some trees from the sides and back of the lot.

Following that, workers began clearing and grading the land in preparation for drainage installation.



Despite the surprise that was the pre-Christmas nor'easter, the drainage pipes were delivered. Further photos to come as work progresses. Be sure to visit the blog regularly for updates.

Settlement's Willow Grove Project Begins!


Welcome back to Settlement's blog! One of our resolutions for 2010? More updates, more regularly.

We'll start with the progress on the Settlement's Willow Grove project. A reminder: the new branch replaces and doubles the capacity of the Jenkintown Branch, which currently is housed in a leased facility.

To give you a clear idea of where we started, the photo on the right shows what the lot looked like less than two months ago.

If you haven't been to the lot recently, then you missed the excellent sign that our builder, TN Ward, built for the site just before construction started. As with any image on the blog, just click for a larger version. Shortly after the sign went up, a trailer and portable restroom were installed on the property, a sure sign the construction was about to begin.

In the second of today's posts, we'll share what happened at the construction site over the recent holidays.